
Prepare the components
The selected construction determines the components and tooling needed for the case. Cutting and forming follow the approved model and its production specification.
Review the production and quality checks to discuss for your order, from case construction and materials to branding and packing.
Different products follow different routes. These case-production processes show how component preparation, decoration, assembly and packing contribute to the finished piece.
Start with an existing model when it suits the brief. A new structure is developed when the project requires it.
Compare the product range

The selected construction determines the components and tooling needed for the case. Cutting and forming follow the approved model and its production specification.

Artwork, position, color and the chosen process are reviewed for the actual surface. A print, foil or debossed finish needs its own approved reference.

For stitched case formats, panels, lining and seam details are brought together during assembly. The route varies with the product construction.

The eyeglass case finish, edge details, opening and overall presentation are reviewed against the selected sample and order requirements.

Confirm the individual packing method and any supporting accessories. For a set, review the finished case, box, bag and care components together.

Packing quantity, protection, carton arrangement and destination requirements are confirmed for the actual order before shipment.
See selected case-production and packing operations in motion.
1st Floor, No. 3 Renmin Road, Wujing, Nanxiong, Guangdong, China
View locations & directionsNo. 17 Xingqian Road, Yuanzhou Town, Boluo, Huizhou, Guangdong, China
View locations & directionsBulk orders can typically be ready for shipment within 45–60 days after confirmation. The final schedule is confirmed in the quotation for the selected product, materials, customization and quantity.
Sampling and transit time are separate. Share your target arrival date so our team can review the complete schedule.
How we review the specificationA model or reference, intended contents, quantity, material direction and artwork give us a useful starting point.